Country-Plan Projects and Tenders |
| 9567 Subject |
توريد طلمبات تبريد لمحطة التبريد لمياه البحر لتخدم وحدة توليد الطاقة قدرة 150 ميجاوات في أبو قير بالاسكندرية لشركة غرب الدلتا لتوليد الكهرباء WDEPC – West Delta Electricity Production Co. postponing the deadline of tender to supply 2 main cooling pumps required for the sea water cooling stations serving four 150 MW units at Abu Qir power station to now become 12/10/2005 instead of 11/10/2005. |
| Date Published | Monday, October 31, 2005 |
| Source Name | Gomhouria |
| Location Name | Alexandria |
|
Description Date Format: (mm/dd/yyyy) |
WDEPC – West Delta Electricity Production Co. has postponed the deadline of tender to supply 2 main cooling pumps required for the sea water cooling stations serving four 150 MW units at Abu Qir power station to now become 12/10/2005 instead of 11/10/2005. Specs fees are L.E. 2,000 & bid bond requested is 2 % of bid value. |
| Sectors Section |
Beneficiary Sectors - Energy Generation - Industry Refrigeration & Air Conditioning Engineering |